Industrial Tourism

Uiam Hydroelectric Power Plant

62-11, Yetgyeongchun-ro, Sindong-myeon, Chuncheon-si, Gangwon-do
About the Festival

Uiam Hydroelectric Power Plant is located downstream from the point where the Bukhan River and the Soyang River meet, in Uiam-ri, Sindong-myeon, Chuncheon-si, Gangwon-do. Uiam Hydroelectric Power Plant generates electricity in conjunction with the upstream Chuncheon and Soyang Power Plants and the downstream Cheongpyeong Power Plant, and the electricity produced is transmitted through power lines connected to the Cheongpyeong Hydroelectric Power Plant to the Gyeongin area, where it accounts for part of the power supply to the Seoul metropolitan area. In addition, it regulates the water flow coming from upstream, supplying water when the river flow decreases and performing a flood control role in summer when the flow increases. With the construction of the Uiam Dam of Uiam Hydroelectric Power Plant, the artificial lake Uiamho was created, and a beautiful natural landscape has formed around it, attracting many visitors every year.

Around here

What is nearby

Within 3 km — walking distance or a short ride.

Location 62-11
View More Tours