The Incheon International Passenger Terminal was built to resolve the inconvenience to users caused by the dual operation (inner port and coastal port) through the construction of the Incheon Port International Passenger Pier and Terminal, to increase port operation efficiency, and to develop Incheon Port into an international tourism port. Construction began in December 2016 and was completed in June 2019, and operations started on June 15, 2020. It has a total floor area of 66,789.62㎡ (terminal building 65,421.15㎡, gate building 1,368.47㎡) and consists of floors 1 to 5 above ground and a rooftop floor.
Around here
What is nearby
Within 3 km — walking distance or a short ride.
Restaurants
See all restaurants →Attractions
See all attractions →Shopping
See all shopping →Festivals
See All Festivals →Photo gallery
Location 57
View More Tours 